CONSTRUCTION OF SOCIAL FACILITIES

In 2017, the funds for construction of social facilities have been estimated in the amount of 8 163,768 million tenge (National Fund – 4 682,440 million tenge, Republican Budget – 701,403 million tenge, Local Budget - 2 779,925 million tenge).
including:

  • for construction of educational facilities – 6 225,253 million tenge;
  • for construction of facilities for the Department of Internal Affairs – 365,384 million tenge;
  • for construction of cultural facilities – 319,628 million tenge;
  • for construction of sports facilities – 308,277 million tenge;
  • for construction of health care facilities – 114,99 million tenge;
  • for construction of environmental facilities – 599,088 million tenge;
  • for construction of agricultural facilities – 30,583 million tenge;
  • for construction of architectural projects – 200,565 million tenge.

 

In 2017, 11 educational facilities are being built for a total of 6 225,253 million tenge(National Fund – 4 682,440million tenge, Republican Budget – 701,403 million tenge, Local Budget – 841,410million tenge, Foreign Investment- 1395,0 million tenge).

Out of the National Fund (under Nurly Zhol program)
1.A school for 900 people in Sarytau micro district in Zachagansk settlement, Uralsk. Total cost is 1 888,144 million tenge. Contractor - “SV Plus” LLP. The school is planned to be put into operation in the 4th quarter of 2017.
2. A school for 600 people (1st stage) in Derkul settlement, Uralsk. Total cost is 1 255,609 million tenge. Contractor – “Altim” LLP. The school is planned to be put into operation in the 4th quarter of 2017.
3. A school for 600 people (2nd stage) in Derkul settlement, Uralsk. Total cost is 1 434,116 million tenge. Contractor – “Altair” LLP. The school is planned to be put into operation in the 4th quarter of 2017.
4.School No. 4 for 300 people in Uralsk. Total cost is 950,606 million tenge. Contractor – “Altair” LLP. The school is planned to be put into operation in the 4th quarter of 2017.

Out of the republican budget
5. A school for 300 people complete with a boarding school for 100 people in Daryinsckoye settlement, Zelenovskiy district. Total cost is 1 011,42 million tenge. Contractor – “SKF Otdelstroy” LLP. Construction of the facility will be continued in 2018.

Out of the local budget
6. A school for 100 people in Kaztalovka village, Kaztalovskiy district. Total cost is 286,152 million tenge. Contractor – “Satti Saulet” LLP. Completed object. Acceptance certificate dated 21.08.2017.
7. A recreation camp for 48 people in Sary Omir village, Terektinskiy district. Total cost is 113,3 million tenge. Contractor – “AlatauAldanAgro” LLP. Construction of the facility will be continued in 2018.
8. A school sports hall in Akoba village, Zhanibekskiy district. Total cost is 63,104 million tenge. Contractor – “Simvol” LLP. The facility is planned to be put into operation in the 4th quarter of 2017.
9. A musical school in Kaztalovka village, Kaztalovskiy district. Total cost is 93,658 million tenge. Construction of the facility will be continued in 2018.тенге.  

Foreign investment (out of the funds of KPO b.v.)
10. A school for 300 people in DDP Araltal, t. Aksai, Burlin district (in the framework of resettlement of residents from Berezovka and Bestau villages). Total cost is 760,0 million tenge. Contractor – “Raza Stroy” LLP. Construction of the school will be continued in 2018.
11. A school for 198 people in Shapdarzhap village, Akzhaikskiy district.  Total cost is 635,0 million tenge. Contractor – “Nauryz” LLP. Construction of the facility will be continued in 2018.

In addition, design estimate documentation for 13 schools is being developed in the region:
1) Construction of a secondary general school for 300 people complete with a boarding school for 100 people in Chapayevo village, Akzhaikskiy district;
2) Construction of a secondary general school for 108 people in Atameken village, Akzhaikskiy district;
3) Construction of a secondary general school for 240 people in Zhambyl village, Zelenovskiy district;
4) Construction of a school for 300 people complete with a boarding school for 100 people in 13 micro district in Aksai, Burlin district;
5) Construction of a school for 108 people in Zhuldyz village, Kaztalovskiy district;
6) Construction of a school for 900 people in Kaztalovka village, Kaztalovskiy district;
7) Construction of a school for 60 people in Sarykudyk village, Kaztalovskiy district;
8) Construction of school № 51 for 900 people in Uralsk;
9) Construction of school № 52 for 900 people in Uralsk;
10) Construction of a school-gymnasium of aesthetics for 600 people in Uralsk;
11) Construction of school № 18 for 300 people in Uralsk;
12) Construction of school № 33 for 300 people in Uralsk;
13) Construction of school № 31 for 400 people in Uralsk.

Construction of cultural facilities – 319,628 million tenge (local budget financing).
1. A home of culture for 300 people in Podstepnoye village, Terektinskiy district. Total cost is 319,628 million tenge. Contractor – “Altair” LLP. Completed object. Acceptance certificate dated 27.11.2017.

Construction of sports facilities – 308,277 million tenge (local budget financing).
1. Sports and recreation center for 160 visits in Kalininskoye village, Zelenovskiy district. Total cost is 282,277 million tenge. Contractor – “Uralskstroyinvest” LLP. The facility is planned to be put into operation in the 4th quarter of 2017.
2. Sports complex for gifted children complete with a boarding school in Uralsk. Total cost is 1 425,205 million tenge. Contractor – “Altair” LLP. Construction of the facility will be continued in 2018.

Construction of health care facilities – 114,99 million tenge (local budget financing).
1. Outpatient  feldsher’s station in Kentubek village, Burlinskiy district. Total cost is 61,4 million tenge. Contractor – “КСG” LLP. The facility is planned to be put into operation in the 4th quarter of 2017.
2. Medical station in Uspenka village, Burlin district. Total cost is 53,59 million tenge. Contractor – “КСG”. The facility is planned to be put into operation in the 4th quarter of 2017.

Construction of facilities for the Department of Internal Affairs – 365,384 million tenge (local budget financing).
1. Addition to a structure of the administration building of the Department of Internal Affairs in Uralsk. Total cost is 794,862 million tenge. Contractor is “KSG” LLP. Construction of the facility will be continued in 2018.

Construction of environmental facilities – 599,088 million tenge (local budget financing).
1. Ulentinskaya system of liman irrigation in Syrymskiy district. Total cost is   103,597 million tenge. Contractor – “Zhienbay” LLP. Completed object. Acceptance certificate dated 23.11.2017.
2. Surplussing works on the Sholakankaty river, Syrymskiy district. Total cost is 103,632 million tenge. Contractor – “PMK-117” LLP. Completed object. Acceptance certificate dated 22.11.2017.
3. A hydraulic overflow structure on the Derkul river in Peremetnoye village, Zelenovskiy district. Total cost is 70,731 million tenge. Completed object. Acceptance certificate dated 23.11.2017.
4. Liman irrigation systems Abdilman and Sorkol out of the Ashchiozek river in Akobinskiy rural district, Zhanibekskiy district. Total cost is 393,583 million tenge. The object is planned to be put into operation in the 4th quarter of 2017.
5. Water intake structure complete with a floating pumping station on the Ural-Chelkar Canal in Terektinskiy district of the WKO. Total cost is 127,367 million tenge. Construction of the facility will be continued in 2018.

Construction of agricultural facilities – 30,583 million tenge (local budget financing).
1. Animal burial site in the area of Uralsk-Saratov highway in Uralsk. Total cost is 30,.583 million tenge. It is planned to be put into operation in the 4th quarter of 2017.

Architectural projects – 200,565 million tenge (local budget financing).

1. A monument to the 25th anniversary of Independence of the Republic of Kazakhstan on a new city square located between 5 and 7 micro districts in Uralsk, WKO. Total cost is 200,.565 million tenge. It is planned to be put into operation in the 4th quarter of 2017.


         AKBULAK


To this day, in the region only 175 villages out of 441 or 39.7% have access to centralized water supply.
In the year 2017, 9,2 billion tenge was allocated for implementation of 39 projects, including:
- out of the republican budget – 5,5 billion tenge (for construction of 25 water supply facilities);
- out of the National Fund – 1,9 billion tenge (for construction of 8water supply facilities);
- out of the local budget – 1,8 billion tenge (for construction of 6water supply facilities (of which 6 new objects, 13 – co-financing).

As reference:
 - Construction of 9 objects will be proceeding in 2018 (Zhalpaktal, Akpater, Kayindy, Taldyapan, Sayrkudyk, Kayshakudyk and Kosaba villages in Kaztalovskiy district, Populated areas starting from the Karatobinskoye field to Ushana village in Karatobinskiy district, Amangeldy village in Taskalinskiy district, Masteksay village (Mukhor) in Zhangalinskiy district, Lubenka village in Chingirlau district, and Volodarskoye village in Zelenovskiy district);
 - 30 objects have not been completed (Aksuat, Bazarsholan, Atameken, Kabyrshakty villagesin Akzhayik district, Saykhin, Borli and Kokterek villagesinBokeyordinskiy district, Borli and Alexandrovka villages in Burlin district, Birlik and Pyatimar villages in Zhangalinskiy district, Zhanibek and Kamysty villages in Zhanibekskiy district, Kushum, Shchapovo, Akzhol and Pavlovo villagesin Zelenovskiy district, Kaztalovka, Bostandyk and Zhanazhol villagesin Kaztalovskiy district, Konyr and Araltobe villages in Syrymskiy district, Merey and Chizha-2 villages in Taskalinskiy district, Akzhayik, Ankaty, Novopavlovka, Sary Omir and Aksuat villages in Terektinskiy district, Tasmola village inChingirlau district).
30 of them will be completed this year. To date, 21 facilities have been put into operation.


Construction of utility and communication infrastructure facilities in the framework of implementation of
“Nurly Zher” house-building program

 According to the results of 10 months of 2017, 14,6 billion tenge have been allocated within the framework of “Nurly Zher” house-building program.

12,7 billion tenge have been allocated for construction of 14 apartment blocks and 188 dwelling houses in rural community:

 1,9 billion tenge have been allocated for construction of 15 utility and communication infrastructure facilities in areas of housing construction, of which:

1 facility at the expense of the National Fund
1. Construction of driveways in residential quarters and melt water disposal in DDP Derkul settlement (1st stage). The length of networks is 14,75 km. (a road).
Contractor – “Uralskvodstroy” JSC
Construction completion is planned in 2018.
4 facilities at the expense of the republican budget
1. Power supply to DDP of residential community “B” in the north-eastern part of Uralsk. The length of networks is 27,593 km.
Contractor – “Elektromontazh” JSC
Construction completion is planned before the end of this year.
2. Power supply to DDP Zhanaomir village, Terektinskiy district. The length of networks is 45,213 km.
Contractor – “SPMK-123” LLP
Construction completion is planned before the end of this year.
3. Development and arrangement of utility and communication infrastructure for five 3-apartment houses in Zhanibek village, Zhanibekskiy district. The length of networks is 0,693 km.
Contractor – “Symvol” LLP
Construction completed. Acceptance certificate dated 20.06.2017.
4. Development and arrangement of utility and communication infrastructure for three 3-apartment houses in Zhanibek village, Zhanibekskiy district. The length of networks is 0,954 km.
Contractor – “Symvol” LLP
Construction completed. Acceptance certificate dated 20.06.2017.

10 facilities at the expense of the local budget.


Housing construction in the framework of
“NurlyZher” house-building program

 

According to the results of 10 months of 2017, 14,6 billion tenge have been allocated within the framework of “NurlyZher” house-building program.

12,7 billion tenge have been allocated for construction of 14 apartment blocks and 188 dwelling houses in rural community:
- 3 apartment blocksthrough “Baiterek Development” JSC for depositors of the Housing Construction Savings Bank, 504 apartments;
- 1apartment blockthrough “BaiterekDevelopment” JSC for “IO KIK” JSC, 180 apartments;
- 6 apartment blocks throughtheProgram “HousingforParticipants of Housing Construction Savings System”, 691 apartments;
- 2 apartment blocks in Uralsk and 14 dwelling houses in rural community for vulnerable social group of population, 396 apartments;
- 2 apartment blocks through “NK “SPK “Oral” JSC and 174 dwelling houses in rural community for persons on the waiting list, 493 apartments.



1,9 billion tenge have been allocated for construction of 15 utility and communication infrastructure facilities in areasof housing construction.

Implementation of the Program within 10 months

In 2017, the plan of putting into operation of housing at the rate of 278,1 thousand square meters, including 77,7 thousand square meters at the expense of the state support.
For 10 months, 313,91 thousand square meters havebeen put into operation at the expense of all sources of financing, of them 57,2 thousand square meters or 790 apartments at the expense of the state funds.
At the year-end, it is planned to put into operation 9 apartment blocks and 143dwelling houses in rural areas:
- 3 apartment blocks through “Baiterek Development” JSC for depositors of the Housing Construction Savings Bank;
- 4 apartmentblocksattheexpense of bond issue for depositors of the Housing Construction Savings Bank;
- 1 apartmentblockfor vulnerable social group of populationon the waiting listof the local executive bodies;
- 1apartment block for residents of a failing building in Depovskaya street;
- 143 dwelling houses in rural community(Akzhaikskiy, Bokeyordinskiy, Zhanibekskiy, Karatobinskiy, Kaztalovskiy, Syrymskiy, Terektinskiy and Chingirlau districts).